Line: 1 to 1 | |||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||||||||||||||
Changed: | |||||||||||||||||||||||||||||||||
< < | 2. Session-1 | ||||||||||||||||||||||||||||||||
> > | 1. Historical Perspectives (Mission / System Design approaches) Peter Roelfsema2. Data Processing Bruno Merín | ||||||||||||||||||||||||||||||||
Welcome, Logistics and Overview Leo Metcalfe | |||||||||||||||||||||||||||||||||
Line: 21 to 24 | |||||||||||||||||||||||||||||||||
Software Development Process (Quality Control, Configuration Control and Testing ...) Jorgo Bakker | |||||||||||||||||||||||||||||||||
Deleted: | |||||||||||||||||||||||||||||||||
< < | Data Processing - Part II Bruno Merín Data Processing - Part III Bruno Merín | ||||||||||||||||||||||||||||||||
HSA (User friendliness and support , HSA population, on-demand reprocessing, interaction with other archives & VO ...) David Ardila Community Support - Part I (Proposal capture, proposal maintenance, technical screening, TAC, observation planning tools, Mission Planning, helpdesk, Workshops, documentation ...) Göran Pilbratt | |||||||||||||||||||||||||||||||||
Deleted: | |||||||||||||||||||||||||||||||||
< < | Community Support - Part II (Proposal capture, proposal maintenance, technical screening, TAC, observation planning tools, Mission Planning, helpdesk, Workshops, documentation ...) Göran Pilbratt | ||||||||||||||||||||||||||||||||
Determining User Wishes (How were user wishes captured? Which groups were involved? Which mechanisms to determine the user wishes worked fine?Were the inputs received actionable?) Stephan Ott Calibration (ground-based, in-flight performance, evaluation, verification, optimisation, Calibration vs. mission phase ...) Anthony Marston | |||||||||||||||||||||||||||||||||
Deleted: | |||||||||||||||||||||||||||||||||
< < | Calibration contd. (ground-based, in-flight performance, evaluation, verification, optimisation, Calibration vs. mission phase ...) Anthony Marston | ||||||||||||||||||||||||||||||||
Wrap-up Discussion (...) Leo Metcalfe -- LeoMetcalfe - 08 Sep 2014 \ No newline at end of file | |||||||||||||||||||||||||||||||||
Added: | |||||||||||||||||||||||||||||||||
> > |
|
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
2. Session-1 |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Added: | ||||||||
> > |
2. Session-1Welcome, Logistics and Overview Leo Metcalfe Historical Perspectives (Mission / System Design approaches) Peter Roelfsema Uplink & Downlink (non-DP) (Uplink software (CUS, PHS/HSPOT, MPS/HILTS), ground segment interfaces, Downlink software (telemetry ingestion, data distribution, auxiliary processors), mission database (Versant)) Jon Brumfitt Data Processing - Part I (User requirements, Scope of DP packages: internal vs external) Bruno Merín EGSE/ILT/Smooth Transition Smooth transition and the ILT experience Steve Guest Preparations for Launch and Early Operations (...) Larry O'Rourke Pointing accuracy (requirements, organization/resources, planning and implementation of improvements) Craig Stephenson Organisation, Management, Manpower Phil Appleton Software Development Process (Quality Control, Configuration Control and Testing ...) Jorgo Bakker Data Processing - Part II Bruno Merín Data Processing - Part III Bruno Merín HSA (User friendliness and support , HSA population, on-demand reprocessing, interaction with other archives & VO ...) David Ardila Community Support - Part I (Proposal capture, proposal maintenance, technical screening, TAC, observation planning tools, Mission Planning, helpdesk, Workshops, documentation ...) Göran Pilbratt Community Support - Part II (Proposal capture, proposal maintenance, technical screening, TAC, observation planning tools, Mission Planning, helpdesk, Workshops, documentation ...) Göran Pilbratt Determining User Wishes (How were user wishes captured? Which groups were involved? Which mechanisms to determine the user wishes worked fine?Were the inputs received actionable?) Stephan Ott Calibration (ground-based, in-flight performance, evaluation, verification, optimisation, Calibration vs. mission phase ...) Anthony Marston Calibration contd. (ground-based, in-flight performance, evaluation, verification, optimisation, Calibration vs. mission phase ...) Anthony Marston Wrap-up Discussion (...) Leo Metcalfe -- LeoMetcalfe - 08 Sep 2014 |