Programme for the Herschel Lessons Learned Meeting: "Operations from Cradle to Grave" | |
< < | May 28-30, 2013 @ESAC Room B5 | > > | May 28-30, 2013 @ESAC Room D1+D2 | |
The meeting emphasises discussion. |
|
META TOPICPARENT |
name="LessonsLearned2013" |
|
META TOPICPARENT |
name="LessonsLearned2013" |
|
META TOPICPARENT |
name="LessonsLearned2013" |
|
META TOPICPARENT |
name="LessonsLearned2013" |
|
META TOPICPARENT |
name="LessonsLearned2013" |
|
META TOPICPARENT |
name="LessonsLearned2013" |
|
META TOPICPARENT |
name="LessonsLearned2013" |
|
META TOPICPARENT |
name="LessonsLearned2013" |
|
META TOPICPARENT |
name="LessonsLearned2013" |
|
META TOPICPARENT |
name="LessonsLearned2013" |
|
META TOPICPARENT |
name="LessonsLearned2013" |
|
META TOPICPARENT |
name="LessonsLearned2013" |
|
META TOPICPARENT |
name="LessonsLearned2013" |
|
META TOPICPARENT |
name="LessonsLearned2013" |
|
META TOPICPARENT |
name="LessonsLearned2013" |
|
META TOPICPARENT |
name="LessonsLearned2013" |
|
META TOPICPARENT |
name="LessonsLearned2013" |
<--
-->
| |
< < | Programme for the Herschel Lessons Learned Meeting: "Operations from Cradle to Grave", May 28-30, 2013 | > > | Programme for the Herschel Lessons Learned Meeting: "Operations from Cradle to Grave"
May 28-30, 2013 @ESAC Room B5 | |
The meeting emphasises discussion. | |
09:30 - 09:40 |
10 |
Welcome, Logistics and Overview |
Leo Metcalfe |
B05 |
09:40 - 11:00 |
80 |
Historical Perspectives (Mission / System Design approaches) |
Moderator TBD |
B05 |
11:00 - 11:30 |
Coffee Break |
| |
< < |
11:30 - 13:00 |
90 |
Uplink Issues (Instrument Commanding (CUS), Mission Planning software, ILT/IST commanding environment ...) |
TBC - Moderator proposed: being confirmed May 10 |
B05 |
13:00 - 13:30 |
30 |
Community Support (Proposal capture, proposal maintenance, technical screening, TAC, observation planning tools, Mission Planning, helpdesk, Workshops, documentation ...) |
TBC - Moderator proposed: being confirmed May 10 |
B05 |
| > > |
11:30 - 13:00 |
90 |
Uplink Issues (Instrument Commanding (CUS), Mission Planning software, ILT/IST commanding environment ...) |
Jon Brumfitt |
B05 |
13:00 - 13:30 |
30 |
Community Support (Proposal capture, proposal maintenance, technical screening, TAC, observation planning tools, Mission Planning, helpdesk, Workshops, documentation ...) |
Göran Pilbratt |
B05 |
| |
| |
< < |
14:30 - 15:30 |
60 |
Community Support contd. (Proposal capture, proposal maintenance, technical screening, TAC, observation planning tools, Mission Planning, helpdesk, Workshops, documentation ...) |
TBC - Moderator proposed: being confirmed May 10 |
B05 |
15:30 - 16:00 |
30 |
Downlink (non-DP) (Ground Segment interfaces, S/W development process, core HCSS S/W development, Mission Data Base (MDB - Versant) ... ) |
TBC - Moderator proposed: being confirmed May 10 |
B05 |
| > > |
14:30 - 15:30 |
60 |
Community Support contd. (Proposal capture, proposal maintenance, technical screening, TAC, observation planning tools, Mission Planning, helpdesk, Workshops, documentation ...) |
Göran Pilbratt |
B05 |
15:30 - 16:00 |
30 |
Downlink (non-DP) (Ground Segment interfaces, S/W development process, core HCSS S/W development, Mission Data Base (MDB - Versant) ... ) |
Moderator TBD |
B05 |
| |
16:00 - 16:30 |
Coffee Break |
| |
< < |
16:30 - 17:15 |
45 |
Downlink (non-DP) (Ground Segment interfaces, S/W development process, core HCSS S/W development, Mission Data Base (MDB - Versant) ... ) |
TBC - Moderator proposed: being confirmed May 10 |
B05 |
| > > |
16:30 - 17:15 |
45 |
Downlink (non-DP) (Ground Segment interfaces, S/W development process, core HCSS S/W development, Mission Data Base (MDB - Versant) ... ) |
Moderator TBD |
B05 |
| |
17:15 - 17:45 |
30 |
Daily consolidation discussion (...) |
Moderator TBD |
B05 |
18:00 |
|
Shuttle to Hotel Alberto Aguilera |
| |
| |
< < |
09:30 - 11:00 |
90 |
Downlink (DP) (design rationale, technical choices (Java, Jython), scope, implementation, SPG, HSA population, on-demand reprocessing, IA/HIPE, performance, user friendliness and support, interaction with other packages ...) |
TBC - Moderator proposed: being confirmed May 10 |
B05 |
| > > |
09:30 - 11:00 |
90 |
Downlink (DP) (design rationale, technical choices (Java, Jython), scope, implementation, SPG, HSA population, on-demand reprocessing, IA/HIPE, performance, user friendliness and support, interaction with other packages ...) |
Bruno Merín |
B05 |
| |
11:00 - 11:30 |
Coffee Break |
| |
< < |
11:30 - 13:00 |
90 |
HSA (User friendliness and support , HSA population, on-demand reprocessing, interaction with other archives & VO ...) |
TBC - Moderator proposed: being confirmed May 10 |
B05 |
13:00 - 13:30 |
30 |
Calibration (ground-based, in-flight performance, evaluation, verification, optimisation, Calibration vs. mission phase ...) |
TBC - Moderator proposed: being confirmed May 10 |
B05 |
| > > |
11:30 - 13:00 |
90 |
HSA (User friendliness and support , HSA population, on-demand reprocessing, interaction with other archives & VO ...) |
David Ardila |
B05 |
13:00 - 13:30 |
30 |
Calibration (ground-based, in-flight performance, evaluation, verification, optimisation, Calibration vs. mission phase ...) |
Anthony Marston |
B05 |
| |
| |
< < |
14:30 - 16:00 |
90 |
Calibration contd. (ground-based, in-flight performance, evaluation, verification, optimisation, Calibration vs. mission phase ...) |
TBC - Moderator proposed: being confirmed May 10 |
B05 |
| > > |
14:30 - 16:00 |
90 |
Calibration contd. (ground-based, in-flight performance, evaluation, verification, optimisation, Calibration vs. mission phase ...) |
Anthony Marston |
B05 |
| |
16:00 - 16:30 |
Coffee Break |
| |
< < |
16:30 - 17:15 |
45 |
Pointing |
TBC - Moderator proposed: being confirmed May 10 |
B05 |
| > > |
16:30 - 17:15 |
45 |
Pointing (...) |
Craig Stephenson |
B05 |
| |
17:15 - 17:45 |
30 |
Daily consolidation discussion (...) |
Moderator TBD |
B05 |
18:00 |
|
Shuttle to Hotel Alberto Aguilera |
| |
| |
< < |
09:30 - 11:00 |
90 |
Quality Control, Configuration Control and Testing |
TBC - Moderator proposed: being confirmed May 10 |
B05 |
| > > |
09:30 - 11:00 |
90 |
Quality Control, Configuration Control and Testing (...) |
Jorgo Bakker |
B05 |
| |
11:00 - 11:30 |
Coffee Break |
| |
< < |
11:30 - 13:00 |
90 |
Organisation, Management, Manpower |
TBC - Moderator proposed: being confirmed May 10 |
B05 |
13:00 - 13:30 |
30 |
Preparations for Launch and Early Operations |
TBC - Moderator proposed: being confirmed May 10 |
B05 |
| > > |
11:30 - 13:00 |
90 |
Organisation, Management, Manpower (...) |
Phil Appleton |
B05 |
13:00 - 13:30 |
30 |
Preparations for Launch and Early Operations (...) |
Moderator TBD |
B05 |
| |
| |
< < |
14:30 - 15:00 |
30 |
Preparations for Launch and Early Operations contd. |
TBC - Moderator proposed: being confirmed May 10 |
B05 |
15:00 - 16:00 |
60 |
Determining User Wishes (...) |
TBC - Moderator proposed: being confirmed May 10 |
B05 |
| > > |
14:30 - 15:00 |
30 |
Preparations for Launch and Early Operations contd. (...) |
Moderator TBD |
B05 |
15:00 - 16:00 |
60 |
Determining User Wishes (...) |
Moderator TBD |
B05 |
| |
16:00 - 17:00 |
60 |
Wrap-up Discussion (...) |
Leo Metcalfe |
B05 |
17:15 |
Transport to Airport |
| | | |
< < | Outline scope for the "Operations from Cradle to Grave" LL Meeting (May 28-30)* | > > | Outline topics for the Meeting | | | |
< < | The details will be elaborated as material is submitted. [Material = Abstracts or "Lessons" submitted to the above-described repository (or one of its ICC equivalents).] | > > | The overall Mission design concept and methodology | | | |
< < | The overall Mission design concept and methodology
| | • Mission Design & Technical drivers (incl. orbit, space environment, lifetime, science data bandwidth, ACMS & pointing, DTCP/GS, …) | |
> > | | | • Structure of the Science Ground Segment (SGS), division of responsibilities, and organisation | |
> > | | | • Concept of Smooth Transitions | |
> > | | | • (Herschel Common Science System) HCSS - Concept, development, and components (MDB, CUS, HSpot, Configuration Control, Build System, System Integration, Testing and Validation) | |
> > | | | • Calibration (Standards & modeling; Cross-calibration: Herschel-Herschel, Herschel-other missions) | |
< < | | | | |
< < | Operations Processes and Procedures
| > > |
Operations Processes and Procedures | | • Operations preparations | |
> > | | | • Support to instrument level tests | |
> > | | | • End-to-end tests and simulations | |
> > | | | • LEOP and Commissioning Phase
-
-
- Calibration, in-flight performance, evaluation, verification, and optimisation
| |
> > | | | • PV Phase
-
-
- AOT-release, calibration, in-flight performance, evaluation, verification, and optimisation
| |
> > | | | • Science Demonstration Phase
-
-
- KP-release, A&A Special Issue, information provision for AO-1
| |
> > | | | • Routine Science Phase
-
-
- Calibration, in-flight performance, evaluation, verification, and optimisation
- Scheduling strategy, policies, flexibility, re-planning
| |
-
-
- Observing programme maintenance/replanning, programme conflicts & optimisation, duplications tools, HOTAC tools, HOTAC meetings
- Downlink (other than DP and Archive)
- Mission DataBase (MDB) / Versant ...
| |
< < | | | | |
< < | Data processing
| > > |
Data processing | | • Providing data to observers - pipeline processing, standard products, HSA population, on demand reprocessing, and interactive data processing | |
> > | | | • HIPE provision - design rationale, technical choices (Java, Jython), scope, implementation, ... | |
> > | | | • HIPE use - performance, user friendliness & support, interaction with other packages, ... | |
< < | | | | |
< < | Herschel Science Archive (HSA)
| > > |
Herschel Science Archive (HSA) | | • User friendliness and support , HSA population, on-demand reprocessing, interaction with other archives & VO | |
< < | | | | |
< < | Science Management
| > > |
Science Management | | • Amount of GT, proprietary time | |
> > | | | • Concept of Key Programme | |
> > | | | • Concept of Science Demonstration Phase (SDP) | |
> > | | | • Scheduling philosophy ("best use of helium" as the principal driver) | |
> > | | | • Handling of calibration observations | |
< < | |
|
META TOPICPARENT |
name="LessonsLearned2013" |
|
META TOPICPARENT |
name="LessonsLearned2013" |
|
META TOPICPARENT |
name="LessonsLearned2013" |
|
META TOPICPARENT |
name="LessonsLearned2013" |
<--
-->
| |
< < | Agenda Herschel Lessons Learned 2013 (draft v0.1) | > > | Programme for the Herschel Lessons Learned Meeting: "Operations from Cradle to Grave", May 28-30, 2013 | |
The meeting emphasises discussion. | |
| |
< < |
| > > |
09:30 - 09:40 |
|
Welcome, Logistics and Overview |
Leo Metcalfe |
B05 |
09:40 - 11:00 |
|
Historical Perspectives (Mission / System Design approaches) |
TBC - Moderator proposed: being confirmed |
B05 |
| |
11:00 - 11:20 |
|
Coffee Break |
| |
< < |
11:20 - 12:30 |
|
Uplink Issues (Instrument Commanding (CUS), Mission Planning software, ILT/IST commanding environment ...) |
TBC - Moderator being confirmed |
B05 |
| > > |
11:20 - 13:30 |
|
Uplink Issues (Instrument Commanding (CUS), Mission Planning software, ILT/IST commanding environment ...) |
TBC - Moderator proposed: being confirmed |
B05 |
| |
| |
< < |
14:30 - 16:00 |
|
Uplink Issues (contd.) (Instrument Commanding (CUS), Mission Planning software, ILT/IST commanding environment ...) |
TBC - Moderator being confirmed |
B05 |
| > > |
14:30 - 16:00 |
|
Uplink Issues (contd.) (Instrument Commanding (CUS), Mission Planning software, ILT/IST commanding environment ...) |
TBC - Moderator proposed: being confirmed |
B05 |
| |
16:00 - 16:20 |
|
Coffee Break |
| |
< < |
16:20 - 17:40 |
|
Community Support ( ...) |
TBC - Moderator being confirmed |
B05 |
| > > |
16:20 - 17:50 |
|
Community Support ( ...) |
TBC - Moderator proposed: being confirmed |
B05 |
| |
18:00 |
Shuttle to Alberto Aguilera |
Wednesday May 29th
| |
< < |
| > > | 08:30 || Shuttle from Alberto Aguilera ||||
09:30 - 11:00 |
|
Downlink (non-DP) (Ground Segment interfaces, S/W development process, core HCSS software development, Mission Data Base (MDB - Versant)) ... |
TBC - Moderator proposed: being confirmed |
B05 |
| |
11:00 - 11:20 |
|
Coffee Break |
| |
< < |
11:20 - 12:30 |
|
Uplink Issues (Instrument Commanding (CUS), Mission Planning software, ILT/IST commanding environment ...) |
TBC - Moderator being confirmed |
B05 |
| > > |
11:20 - 12:30 |
|
Downlink (DP) (design rationale, technical choices (Java, Jython), scope, implementation, SPG, HSA population, on-demand reprocessing, IA/HIPE, performance, user friendliness and support, interaction with other packages ...) |
TBC - Moderator proposed: being confirmed |
B05 |
| |
| |
< < |
14:30 - 16:00 |
|
Uplink Issues (contd.) (Instrument Commanding (CUS), Mission Planning software, ILT/IST commanding environment ...) |
TBC - Moderator being confirmed |
B05 |
| > > |
14:30 - 16:00 |
|
HSA (User friendliness and support , HSA population, on-demand reprocessing, interaction with other archives & VO ...) |
TBC - Moderator proposed: being confirmed |
B05 |
| |
16:00 - 16:20 |
|
Coffee Break |
| |
< < |
16:20 - 17:40 |
|
Community Support ( ...) |
TBC - Moderator being confirmed |
B05 |
| > > |
16:20 - 17:50 |
|
Calibration (ground-based, in-flight performance, evaluation, verification, optimisation, Calibration vs. mission phase ...) |
TBC - Moderator proposed: being confirmed |
B05 |
| |
18:00 |
Shuttle to Alberto Aguilera |
Thursday May 30th
| |
< < |
| > > | 08:30 || Shuttle from Alberto Aguilera ||||
09:30 - 11:00 |
|
Pointing |
TBC - Moderator proposed: being confirmed |
B05 |
| |
11:00 - 11:20 |
|
Coffee Break |
| |
< < |
11:20 - 12:30 |
|
Uplink Issues (Instrument Commanding (CUS), Mission Planning software, ILT/IST commanding environment ...) |
TBC - Moderator being confirmed |
B05 |
| > > |
11:20 - 12:30 |
|
Quality Control, configuration Control and Testing |
TBC - Moderator proposed: being confirmed |
B05 |
| |
| |
< < |
14:30 - 16:00 |
|
Uplink Issues (contd.) (Instrument Commanding (CUS), Mission Planning software, ILT/IST commanding environment ...) |
TBC - Moderator being confirmed |
B05 |
| > > |
14:30 - 16:00 |
|
Uplink Issues (contd.) (Instrument Commanding (CUS), Mission Planning software, ILT/IST commanding environment ...) |
TBC - Moderator proposed: being confirmed |
B05 |
| |
16:00 - 16:20 |
|
Coffee Break |
| |
< < |
16:20 - 17:40 |
|
Community Support ( ...) |
TBC - Moderator being confirmed |
B05 |
| > > |
16:20 - 17:50 |
|
Community Support ( ...) |
TBC - Moderator proposed: being confirmed |
B05 |
| |
18:00 |
Shuttle to Alberto Aguilera |
|
|
META TOPICPARENT |
name="LessonsLearned2013" |
|
META TOPICPARENT |
name="LessonsLearned2013" |
|
META TOPICPARENT |
name="LessonsLearned2013" |
| |
< < | | | <--
--> | |
Agenda Herschel Lessons Learned 2013 (draft v0.1) | |
> > |
The programme will be expanded once all Abstracts are in.
The meeting will build in-depth discussion of experiences and Lessons Learned around key presentations.
Throughout the month of May specific "lessons" and ideas for discussion will be collected.
A dedicated interface and template for making suggestions will be opened and announced in early May.
Suggestions so gathered will be used to stimulate discussion during the meeting.
| | <-- | PDF Version | Click here | -->
Tuesday May 28th |
|
META TOPICPARENT |
name="LessonsLearned2013" |
| |
> > | | | <--
--> | |
|
Plenary session |
|
Discussion |
|
Presentation |
\ No newline at end of file | |
> > |
| | \ No newline at end of file |
|
> > |
META TOPICPARENT |
name="LessonsLearned2013" |
<--
-->
Agenda Herschel Lessons Learned 2013
<-- | PDF Version | Click here | -->
Tuesday May 28th
Wednesday May 29th
Thursday May 30th
Legend
|
Plenary session |
|
Discussion |
|
Presentation |
|
Workshop |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|