Herschel Lessons Learned Meeting: 28-30 May 2013

Line: 7 to 7
 
Start Tue 28 May 09:00
End Thu 30 May 16:00
Added:
>
>
DEADLINE for ABSTRACTS: eob May 6 2013
 

Scope and goals

Objectives of the Lessons Learned exercise

Changed:
<
<
The top-level objectives for the end-May 2013 Lessons Learned Meeting are:
   •  Capture the good, the bad, and the ugly.
      *  In particular "best practices" to be passed on for future missions
      but should also document particular problems and in general important experience.
   •  Generate conclusions and recommendations based on the above.
   •  Propagate the above LL output (into ESA and towards future missions) as appropriate.
   •  Generate a written Report and presentation(s).
>
>

The top-level objectives for the end-May 2013 Lessons Learned Meeting are:

  • Capture the good, the bad, and the ugly, in particular "best practices" to be passed on for future missions, but should also document particular problems and in general important experience.
 
Changed:
<
<
Outline scope for the "Operations from Cradle to Grave" LL Meeting (May 28-30)
>
>
  • Generate conclusions and recommendations based on the above.

  • Propagate the above LL output (into ESA and towards future missions) as appropriate.

  • Generate a written Report and presentation(s).

Outline scope for the "Operations from Cradle to Grave" LL Meeting (May 28-30)*

  The details will be elaborated as material [Abstracts or other LL suggestions (contact an HSC Group Leader for your area of interest)] is submitted.

Added:
>
>
The overall Mission design concept and methodology
 

Deleted:
<
<
• The overall Mission design concept and methodology
  • Mission Design & Technical drivers (incl. orbit, space environment, lifetime, science data bandwidth, ACMS & pointing, DTCP/GS, …) • Structure of SGS, division of responsibilities, and organisation • Concept of Smooth Transitions • HCSS - Concept, development, and components (MDB, CUS, HSpot, Configuration Control, Build System, System Integration, Testing and Validation) • Calibration (Standards & modelling; cross-calibration: Herschel-Herschel, Herschel-other missions)
Changed:
<
<
• Operations Processes and Procedures
>
>

Operations Processes and Procedures

  • Operations preparations • Support to instrument level tests • End-to-end tests and simulations • LEOP and Commissioning Phase
Changed:
<
<
• Calibration, in-flight performance, evaluation, verification, and optimisation
>
>
      • Calibration, in-flight performance, evaluation, verification, and optimisation
  • PV Phase
Changed:
<
<
• AOT-release, calibration, in-flight performance, evaluation, verification, and optimisation
>
>
      • AOT-release, calibration, in-flight performance, evaluation, verification, and optimisation
  • Science Demonstration Phase
Changed:
<
<
• KP-release, A&A Special Issue, information provision for AO-1
>
>
      • KP-release, A&A Special Issue, information provision for AO-1
  • Routine Science Phase
Changed:
<
<
• calibration, in-flight performance, evaluation, verification, and optimisation • scheduling strategy, policies, flexibility, re-planning • Community Support - Level of service provided to community (excl. downlink) • Helpdesk • Information provision (documentation, mailings, and web) • Workshops (uplink/HSpot, downlink/HIPE, topical) • Observing programme maintenance/replanning, programme conflicts & optimisation, duplications tools, HOTAC tools, HOTAC meetings • Downlink (other than DP and Archive) • MDB / Versant ... • Data processing
>
>
      • Calibration, in-flight performance, evaluation, verification, and optimisation
      • Scheduling strategy, policies, flexibility, re-planning
      • Community Support - Level of service provided to community (excl. downlink)
      • Helpdesk
      • Information provision (documentation, mailings, and web)
      • Workshops (uplink/HSpot, downlink/HIPE, topical)
      • Observing programme maintenance/replanning, programme conflicts & optimisation, duplications tools, HOTAC tools, HOTAC meetings
      • Downlink (other than DP and Archive)
      • MDB / Versant ...

Data processing

  • Providing data to observers - pipeline processing, standard products, HSA population, on demand reprocessing, and interactive data processing • HIPE provision - design rationale, technical choices (Java, Jython), scope, implementation, ... • HIPE use - performance, user friendliness & support, interaction with other packages, ...
Changed:
<
<
• Herschel Science Archive (HSA)
>
>

Herschel Science Archive (HSA)

  • User friendliness and support , HSA population, on-demand reprocessing, interaction with other archives & VO
Changed:
<
<
• Science management
>
>

Science management

  • Amount of GT, proprietary time • Concept of KP • Concept of SDP
 