Difference: LessonsLearned2013 (12 vs. 13)

Revision 132013-05-01 - LeoMetcalfe

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Herschel Lessons Learned Meeting: "Operations from Cradle to Grave"

Line: 11 to 11
 

DEADLINE for ABSTRACTS: eob May 6 2013

Changed:
<
<
(The Science Operations Coordination Group will assess the inputs received on May 7)
>
>
(The Science Operations Coordination Group will assess the inputs received on May 7. Registrations will be accepted up to May 13.)
 

Scope and goals

Line: 36 to 36
 
The overall Mission design concept and methodology
   • Mission Design & Technical drivers (incl. orbit, space environment, lifetime, science data bandwidth, ACMS & pointing, DTCP/GS, …)

Changed:
<
<
• Structure of SGS, division of responsibilities, and organisation
>
>
• Structure of the Science Ground Segment (SGS), division of responsibilities, and organisation
  • Concept of Smooth Transitions
Changed:
<
<
• HCSS - Concept, development, and components (MDB, CUS, HSpot, Configuration Control, Build System, System Integration, Testing and Validation)
>
>
• (Herschel Common Science System) HCSS - Concept, development, and components (MDB, CUS, HSpot, Configuration Control, Build System, System Integration, Testing and Validation)
  • Calibration (Standards & modelling; cross-calibration: Herschel-Herschel, Herschel-other missions)
Line: 62 to 62
 
      • Workshops (uplink/HSpot, downlink/HIPE, topical)
      • Observing programme maintenance/replanning, programme conflicts & optimisation, duplications tools, HOTAC tools, HOTAC meetings
      • Downlink (other than DP and Archive)
Changed:
<
<
      • MDB / Versant ...
>
>
 

Data processing
Line: 80 to 80
 
Science Management
   • Amount of GT, proprietary time

Changed:
<
<
• Concept of KP • Concept of SDP • Scheduling philosophy ("best use of helium" the principal driver)
>
>
• Concept of Key Programme • Concept of Science Demonstration Phase (SDP) • Scheduling philosophy ("best use of helium" as the principal driver)
  • Handling of calibration observations

Methodology of the exercise

  • Material, in the form of Abstracts of proposed talks will be gathered, with the deadline for receiving abstracts being eob on May 6 2013.
Added:
>
>
(Registrations will be accepted up to May 13.)
 
  • An effort will be made to associate an "Advocate" with each key area of the meeting, who could:
    • present a summary/distillation of the collected views
 
This site is powered by the TWiki collaboration platform Powered by Perl