Difference: DocumentationSprints (3 vs. 4)

Revision 42011-09-02 - DavideRizzo

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Documentation Sprints

Line: 47 to 47
 

What happens after a sprint closes?

  • The Editorial Board approves a final version of the document.
Changed:
<
<
  • The revised version is merged into the documentation framework (if Editorial Board members control it), or if the piece must be checked in by a developer (e.g. a URM entry), the Editorial Board will raise an SCR with the text to include.
>
>
  • The revised version is merged into the documentation.
 

Why Google Docs and not this TWiki?

Line: 60 to 60
 

Active documentation sprints

Changed:
<
<
None at the moment.
>
>
None at the moment. The next documentation sprint will be on the plot chapter of the Data Analysis Guide and is planned for late September/early October 2011.
 

Past documentation sprints

\ No newline at end of file
Added:
>
>
The Editorial Board is working to include the results of this sprint into the documentation.
 \ No newline at end of file
 
This site is powered by the TWiki collaboration platform Powered by Perl